space

Alusysteme - Metallbau Bellmann GmbH

Welcome to one of the biggest providers in the components sector for aluminium systems and metal construction in Saxony.

EN  
DE  
your current position:
»References »Alu-Constructions

Contact Person

 

Markus Richter

Engineer

Phone: +49 37322 563 18

eMail:   markus [.] richter [at] bellmann [.] de

 

Frank Pech

Engineer

Phone: +49 37322 563 12

eMail:   frank [.] pech [at] bellmann [.] de

References of Bellmann in the Sector of Metal Construction

 

Intended Work:

Thüringen-Klinik, new construction psychiatry, Saalfeld

 

Time Frame:

06/2013 - 06/2015

 

Order Volume:

1,000,000.00 Euro

 

Necessary Performance:

  • planning, production and assembly of aluminium facades (approx. 560 m*m)
  • planning, production and assembly of aluminium window and door elements in varying sizes (approx. 900 m*m)
  • planning, production and assembly of smoke and fire proof elements
  • planning and assembly of automatic sliding doors
  • delivery and assembly of external blind system (215 pieces)
  • planning, production and assembly of fixed sun protection systems (approx. 200 pieces)
  • glassing of all aluminium elements (approx. 1,000 m*m)

 

Intended Work:

facade reconstruction at MAN Truck & Bus AG in München

 

Time Frame:

10/2011 - 07/2012

 

Order Volume:

840,000.00 Euro

 

Necessary Performance:

• restoration of the outer hull of the building under thermal energy demand guidelines

• scheduling and implementation

• demolition and disposal

• production and assembly of the facade (approx. 800 m*m) and sun protection systems (80 pieces)

• coordination of the WDV-System (approx. 1.100 m*m) and scaffolding tasks (approx. 1.800 m*m)

• through the usage of dust protection walls we were able to organize the construction and restoration during an ongoing work within the company

 

Intended Work:

modification and restoration of a forming plant into a youth hostel

 

Time Frame:

10/2010 - 06/2012

 

Order Volume:

1,200,000.00 Euro

 

Necessary Performance:

• planning, production and assembly of an aluminum facade in varying sizes (approx. 400 m*m)

• planning, production and assembly of window and door elements in varying sizes (approx. 160 m*m)

• planning, production and assembly of smoke and fire proof elements (approx. 130 m*m)

• glassing of all aluminum elements (approx. 690 m*m)

 

Intended Work:

restoration/extension of bureau buildings for Ardenne Anlagentechnik GmbH in Dresden

 

Time Frame:

01/2011 - 10/2011

 

Order Volume:

265,000.00 Euro

 

Necessary Performance:

• planning and production of an aluminum facade of varying sizes (approx. 295 m*m)

• planning and production of aluminum door and window elements in varying sizes (approx. 45 m*m)

• planning und production of smoke and fire proof elements (approx. 35 m*m)

 

Intended Work:

Modification of facades and outside facilities of ERNI Electronics GmbH in Adelberg

 

Time Frame:

11/2010 - 09/2011

 

Order Volume:

300,000.00 Euro

 

Necessary Performance:

• production and assembly of multiple pieced window elements (approx. 90 pieces)

• assembly of sliding doors

• production and assembly of aluminum door elements

• delivery and assembly of an external blind system (approx. 75 pieces)

• glassing of all aluminum elements (approx. 420 m*m)

 

Intended Work:

Restoration of the facade at MAN Nutzfahrzeuge AG in München

 

Time Frame:

08/2008 - 04/2009

 

Order Volume:

3,200,000.00 Euro

 

Necessary Performance:

• restoration of the outer hull of the bureau buildings under thermal energy demand guidelines

• scheduling and implementation

• demolition and disposal of the old facade

• production and assembly of the facade (ca. 4.000 m*m) and the sun blind system (597 pieces)

• coordination of the heat insulation composite system (ca. 4.100 m*m) and scaffolding works (ca. 6.800 m*m)

• through the usage of dust protection walls we were able to organize the construction and restoration during an ongoing work within the company

 

Intended Work:

Restoration of the shed glazing at MAN Nutzfahrzeuge AG in München

 

Time Frame:

10/2007 - 02/2008

 

Order Volume:

5,900,000.00 Euro

 

Necessary Performance:

• restoration of 2.600 lin. m shed glazing

• scheduling and implementation

• demolition and disposal of the construction elements and glazing

• production and assembly of the facade (ca. 10.000 m*m)

• coordination of the scaffolding assembly and channel sealing

• we were able to organize the construction during an ongoing work within the company

 

Intended Work:

Accra Beach Hotel & Spa, Christ Church, Barbados

 

Time Frame:

05/2006 - 10/2006

 

Order Volume:

875,000.00 Euro

 

Necessary Performance:

  • planning, production and assembly of hurricane-proof aluminium window and door elements in varying sizes (approx. 500 pieces)
  • glassing of all aluminium elements (approx. 800 m*m)
 

Prequalifications

Our trademark is registered at the "Verein für Präqualifikation von Bauunternehmen e.V." (register number: 010.025450)

Fire Protection

We are member of the "Überwachungsgemeinschaft Sachsen für Feuerschutz-, Rauchschutz- und Schutzraumabschlüsse e.V."

Manufacturer's Qualification

Manufacturer's qualification certificate for welding of steel constructions after DIN 18800-7:2008-11

 
space

Copyright 2017 Bellmann GmbH - Design & Programming: Advertising Agency Dresden

More links: FTM | Bellmann Stahlbau | Burkhardt & Partner

space